Installation

Installation:

Follow these simple steps to set up your ARSA Ice Bath correctly and prepare it for use. Proper placement, water filling, drainage, and startup help ensure a smooth installation experience.

Placement

Place your ARSA Ice Bath on a flat, stable, and level surface that can safely support the weight of the bath when filled with water and in use. Ensure there is sufficient space around the unit for comfortable access, cleaning, and maintenance. If you are using an ice bath chiller, position it according to the manufacturer's ventilation and clearance requirements.

Power

If your ARSA Ice Bath setup includes an electric chiller, ensure that the power supply matches the specifications provided by the manufacturer. Use a properly grounded electrical outlet with suitable residual-current protection, and keep plugs and electrical connections away from water. Do not use damaged cables or extension leads in wet areas. If you are unsure about the electrical requirements, consult a qualified electrician.

Hoses

If your setup includes a chiller, connect the inlet and outlet hoses to the corresponding ports on the ice bath and chiller, following the supplied instructions. Check that all connections are secure and that the hoses are free from kinks, twists, or obstructions. Ensure the water flow direction is correct before starting the system.

Water Connections

Before filling your ARSA Ice Bath, check that all hose connections and fittings are properly secured. Ensure that the drainage outlet is closed and that the bath is positioned correctly. Use clean water and follow the manufacturer's recommended water level. If a chiller is connected, make sure the required water circulation system is correctly connected before powering on the equipment.

Drainage

Position your ARSA Ice Bath where drained water can be safely directed to a suitable drainage point. Before draining, switch off and disconnect the chiller from the power supply, following the manufacturer's instructions. Open the drainage valve or outlet carefully and allow the water to drain completely. Avoid discharging water where it could cause flooding, property damage, or slippery surfaces.

First Fill

Close the drainage outlet securely before adding clean water. Fill the bath to the recommended level specified in the product instructions. Inspect the bath, drain, and hose connections for leaks. If a chiller is included, confirm that its water circulation system is filled and ready for operation according to the manufacturer's instructions. Do not run the chiller without the required water flow.

Startup

Once the bath is filled and all connections have been checked, follow the manufacturer's startup instructions. If using a chiller, verify that water is circulating correctly before switching on the cooling function. Set your desired water temperature using the available controls, if applicable, and allow the water to reach the selected temperature before use. Always check the water temperature before entering the bath.

Troubleshooting

For your safety, never open electrical components or attempt repairs while the unit is connected to power. If the problem persists, contact the ARSA team for assistance.

Shopping Cart
Scroll to Top